Procedure - Water Ionizer Installation | | |
|
Water Ionizer Installation 1) Please see the picture below on how to install these water line at the bottom of the water ionizer. 2) The rest of the installation are straight forward and provided in the box.
3) After in the system, it is recommended to run the system for 10 minutes to prepare the filter before using.
|